suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Blower Motor Relay > < Diagram Information and Instructions|Page 3148
Page 1
background image

Blower Motor: Service and Repair

Blower Motor Removal and Installation

Blower Motor Removal

1. Disconnect the negative battery cable.
2. Remove the glove box. Refer to Glove Box Removal.
3. Remove the footwell upper cover. Refer to Instrument Panel Removal.
4. Remove the blower motor cooling hose.
5. Remove the motor and the seal from the heater/air distribution case by gently pulling the motor straight down and out.
6. Remove the screws that secure the motor to the heater/air distributor case.

7. Remove the motor, the seal, and the shock mount pads from the heater/air distributor case by gently pulling the motor straight down and out.

Blower Motor Installation

1. Install the blower motor and the seal with the shock mount pads in the heater/air distributor case. Hold the blower motor in position.
2. Install the screws to secure the blower motor to the heater/air distributor case.

Tighten:
Tighten the blower motor-to-heater/air distributor case screws to 6 N.m (53 lb.in).

3. Install the blower motor cooling hose.
4. Connect the blower motor electrical connector.
5. Connect the negative battery cable.
6. Confirm that the blower motor operates properly.
7. Install the footwell upper cover. Refer to Instrument Panel Installation.

8. Install the glove box. Refer to Glove Box Installation.

Blower Motor Relay > < Diagram Information and Instructions|Page 3148