Verona L6-2.5L (2005)
7. Install the high-pressure pipe-to-receiver-dryer connecting block nut.
Tighten:
Tighten the high-pressure pipe-to receiver-dryer connecting block nut to 10 N.m (89 lb.in).
8. Install a new O-ring onto the discharge hose connecting block fitting.
9. Install the discharge hose fitting into the condenser.
10. Install the discharge hose connecting block-to-condenser retaining nut at the condenser connecting block.
Tighten:
Tighten the discharge hose connecting block-to-condenser nut to 16 N.m (12 lb.ft).
11. Install the radiator. Refer to Radiator Installation.
12. Evacuate and recharge the A/C system. Refer to Discharging, Adding Oil, Evacuating, and Charging Procedures for A/C System.
13. Connect the negative battery cable.
14. Operate the HVAC control to verify the proper function of the heating and cooling systems.