Verona L6-2.5L (2005)
4. Tighten the bolt on the band clamp.
Tighten:
Tighten the band clamp bolt to 5 N.m (44 lb.in).
5. Install the high-pressure pipe into the receiver-dryer.
6. Install the high-pressure pipe-to-receiver-dryer connecting block nut.
Tighten:
Tighten the high-pressure pipe-to-receiver-dryer connecting block nut to 10 N.m (89 lb.in) and the receiver-dryer-to-condenser pipe nut to 14 N.m
(10 lb-ft).
7. Evacuate and recharge the A/C system. Refer to Discharging, Adding Oil, Evacuating, and Charging Procedures for A/C System.