Verona L6-2.5L (2005)
2. Connect the harness connector to the back of the generator, and the generator lead to the battery.
3. Route the serpentine accessory drive belt. Refer to Serpentine Accessory Drive Belt Installation.
4. Relieve tension on the belt by first applying downward pressure on the automatic tension roller bolt and releasing pressure once the belt is in place.
5. Connect the negative battery cable.