suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Procedures|Page 3038 > < Procedures|Page 3036
Page 3
background image

4. Install the front exhaust pipe and centermember.

5. In case of manual transaxle vehicle, install the shift control bracket and clip.

6. Install the steering interim shaft and bolt.

Tighten: Tighten the steering interim shaft bolt to 25 Nm (18 ft. lbs.).

7. Install the power steering pipe union nuts.

Tighten: Tighten the power steering pipe union nuts to 30 Nm (22 ft. lbs.). 

8. Fill the power steering oil into the power steering system.

Impact Beam Removal and Installation

Procedures|Page 3038 > < Procedures|Page 3036