suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Canister Vent Valve|Testing and Inspection|Page 1794 > < Canister Vent Valve|Testing and Inspection
Page 2
background image

b. When not using SUZUKI scan tool:

i.

Using service wire (2), connect C51-2-5 terminal of ECM (PCM) (1) coupler and body ground with ignition switch OFF.

ii. Turn ON ignition switch.

In this state, blow hose "A" (3). 

Air should not come out of hose "B" (4).

If check results are as described above and C51-2-5 terminal to ECM (PCM) connection is OK, EVAP canister air valve and its circuit are
in good condition, connect vacuum hoses securely.

If not, check air valve, wire harness and connections.

EVAP CANISTER AIR VALVE INSPECTION

1. With ignition switch OFF, disconnect coupler from EVAP canister air valve.
2. Remove canister bracket from vehicle body (with ORVR).

Canister Vent Valve|Testing and Inspection|Page 1794 > < Canister Vent Valve|Testing and Inspection