Vitara JLX (2Dr) 4WD L4-2.0L (2001)
11. Install timing chain guide No. 1 (1).
Tightening torque
Timing chain guide No. 1 bolt (a): 9 Nm (0.9 kg-m, 6.5 ft. lbs.)
12. Check that dark blue (2) and yellow (4) plate of 1st timing chain are in match with match marks on sprockets respectively.
13. Install 2nd timing chain.
14. Install timing chain cover.
15. Install cylinder head cover.
16. Install oil pan and oil pump strainer.
17. Install cooling system and other parts.
18. Refill cooling system with coolant, front differential with gear oil, engine with engine oil and power steering system with specified fluid.
19. Verify that there is no coolant leakage, power steering fluid leakage, exhaust gas leakage and oil leakage at each connection.