suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Coolant Line/Hose|Service and Repair|Page 576 > < Refrigerant Filter|Testing and Inspection
Page 1
background image

Coolant Line/Hose: Service and Repair

COOLING WATER PIPES OR HOSES
[G16 and J20 engines]
REMOVAL 

1. Drain cooling system.
2. To remove these pipes or hoses, loosen screw on each pipe or hose clip and pull hose end off.

INSTALLATION

Install removed parts in reverse order of removal procedure, noting the following. 
^

Tighten each clamp bolt securely.

^

When installing water outlet pipe to cylinder head, apply sealant to pipe bolt thread and then tighten it (J20 engine only).
Sealant "A": 99000-31110 (SUZUKI BOND No.1215.)

^

Refill cooling system with proper coolant, referring to description on "COOLANT" and steps 8. to 10. of "COOLING SYSTEM FLUSH AND
REFILL" located under Cooling System.

^

Check each part for leakage.

[H25 engine]
REMOVAL 

1. Disconnect negative cable at battery.
2. Drain coolant. 

3. Remove radiator inlet, outlet hoses and radiator outlet pipe.

4. Remove throttle body and intake manifold. Refer to Fuel Delivery and Air Induction.
5. Disconnect coolant temperature sensor (ECT sensor) coupler.
6. Disconnect heater inlet hose from water outlet cap.

Coolant Line/Hose|Service and Repair|Page 576 > < Refrigerant Filter|Testing and Inspection