suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Steering Shaft > < Steering Gear|Specifications|Page 4241
Page 2
background image

^

After confirming that front tire is in straight position, install steering gear box to body temporarily. Next, with tie-rod end installed to knuckle, set
rack in position close to neutral. Then obtain the neutral state by aligning match marks on pinion shaft and steering gear case.

^

Install steering shaft joint to pinion shaft and tighten shaft joint bolts.

CAUTION:  Be sure to confirm that steering wheel and front tires (wheels) are in straight position when installing steering shaft lower assembly.

^

If a plug was put to disconnected pipe when removing steering gear box, remove that plug before reconnecting pipe.

^

Use specified torque as given below.
Tightening Torque

(a): 25 Nm (2.5 kg-m, 18.0 ft. lbs.) 
(b): 35 Nm (3.5 kg-m, 25.5 ft. lbs.) 
(c): 55 Nm (5.5 kg-m, 40.0 ft. lbs.) 

^

Connect tie-rod end to knuckle and tighten new tie-rod end nut referring to Tie-Rod End Installation. See: Tie Rod/Tie Rod End 

^

After installation, be sure to fill specified power steering fluid and bleed air.

^

Check toe setting. Adjust as required.

Steering Shaft > < Steering Gear|Specifications|Page 4241