Vitara JX (2Dr) 4WD L4-1.6L DOHC MFI (1999)
Before installing caliper (cylinder body) to carrier, check to ensure that guide pin (pin bolt) inserted in each caliper carrier hole can be moved
smoothly in thrust direction.
NOTE: Where temperature gets as low as -30°C in cold weather, use rubber grease whose viscosity varies very little even at -40°C (-40°F).
INSTALLATION
1) Install caliper to caliper carrier.
2) Torque caliper pin bolts to specifications.
Tightening Torque
(a): 50 Nm (5.0 kg-m, 36.5 ft. lbs.)
(b): 85 Nm (8.5 kg-m, 61.5 ft. lbs.)
(c): 27 Nm (2.7 kg-m, 20.0 ft. lbs.)
NOTE: Make sure that boots are fit into groove securely.
3) Install brake flexible hose as shown and torque hose mounting bolt to specification.
Tightening Torque (a): 23 Nm (2.3 kg-m, 17.0 ft. lbs.)