suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Valve Cover > < Rocker Arm Assembly|Specifications|Page 777
Page 10
background image

13. After applying sealant to part "A" as shown in figure at the left, install distributor case to cylinder head and tighten its fixing bolts to specified

torque.
"A" Sealant: 99000-31110

Tightening Torque (a): 11 Nm (8.0 ft. lbs.)

Install distributor assembly.

14. Adjust valve clearance.
15. Install cylinder head cover and air intake pipe.
16. Install radiator and refill cooling system referring to ENGINE COOLING.

17. Install hood lock to front upper member, connect lead wire to horn and then install front upper member to body.
18. Install front grill.

Clamp as shown in figure should be removed from front grill and installed to body first. Then install front grill to clamp.

19. Refill A/T fluid.
20. Connect negative cable at battery.
21. Upon completion of installation, verify that there is no coolant leakage or A/T fluid leakage (for A/T vehicle) at each connection.
22. Adjust ignition timing.

Valve Cover > < Rocker Arm Assembly|Specifications|Page 777