suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Relays and Modules - Instrument Panel > < HVAC Control Module Programming and Setup|Page 126
Page 2
background image

2. Install the blower motor control module screws to the HVAC module.

Tightening torque
Tighten the screws to 1.5 N.m (13 lb.in).

3. Connect the electrical connector to the blower motor control module.

Relays and Modules - Instrument Panel > < HVAC Control Module Programming and Setup|Page 126