XL-7 4WD V6-2.7L (2003)
17. Install pressure switch (1) to pump body.
Tightening torque
Pressure switch (b): 28 Nm (2.8 kgf-m, 20.5 ft. lbs.)
18. Apply power steering fluid to relief valve (flow control valve).
19. Install relief valve (flow control valve) to pump body.
20. Install flow control spring.
21. Apply power steering fluid to O-rings of plug.
22. Install O-rings to plug.
23. Tighten plug to specified torque.
Tightening torque
Plug (a): 60 Nm (6.0 kgf-m, 43.5 ft. lbs.)
24. Apply power steering fluid to O-ring (2) of suction connector (1).
25. Install O-ring (2) to suction connector (1).