suzuki Workshop Repair Guides

Suzuki Workshop Service and Repair Manuals

Exhaust Manifold|Specifications|Page 1264 > < Exhaust Manifold|Specifications|Page 1262
Page 3
background image

5. Install exhaust No.1 (1) pipe.

Tighten exhaust No.1 pipe bolts and nuts to specified torque.
Tightening torque
Exhaust No.1 pipe bolt and nut (b): 50 Nm (5.0 kgf-m, 36.5 ft. lbs.)

6. Reverse removal procedure to install front propeller shaft if removed.

When installing propeller shaft, align match mark (1).
Use the following specification to torque universal joint flange.
Tightening torque
Universal joint flange bolt (c): 55 Nm (5.5 kgf-m, 40.0 ft. lbs.)

7. Connect EGR pipe to left (No. 1) bank exhaust manifold (1). 
8. Install exhaust manifold covers (2). 
9. Install oil level gauge guide (3) using new O-ring.

10. Install P/S pump assembly (4) if it was removed.
11. Adjust P/S pump drive belt tension. 

Exhaust Manifold|Specifications|Page 1264 > < Exhaust Manifold|Specifications|Page 1262