4 Runner 2WD V6-4.0L (1GR-FE) (2006)
a. Install the brake master cylinder side lock nut and rod operating adapter on the brake master cylinder.
Torque: 26 Nm (260 kgf-cm, 19 ft. lbs.)
b. Install the lock nut and master cylinder push rod clevis on the rod operating adapter.
Torque: 26 Nm (260 kgf-cm, 19 ft. lbs.)
29. INSTALL MASTER CYLINDER SOLENOID
a. Install a new gasket.
NOTICE: Keep all surfaces of the master cylinder solenoid, master cylinder and gasket, especially contact surfaces, away from water and
dust.
b. Install the master cylinder solenoid with 6 new bolts.
Torque: 32 Nm (326 kgf-cm, 24 ft. lbs.)