4 Runner 2WD V6-4.0L (1GR-FE) (2006)
5. INSTALL KNOCK SENSOR
a. Install the 2 knock sensors with the 2 bolts as shown in the illustration.
Torque: 20 N.m (204 kgf.cm, 15 ft.lbf)
b. Connect the 2 knock sensor connectors.
6. INSTALL WATER OUTLET PIPE NO.1
Torque: 10 N.m (102 kgf.cm, 7 ft.lbf)
7. CONNECT HEATER WATER INLET HOSE A
8. INSTALL CYLINDER HEAD SUB-ASSY