4 Runner 2WD V6-4.0L (1GR-FE) (2006)
a. Connect the tie rod end to the steering knuckle arm.
b. Install the nut and cotter pin.
Torque: 91 Nm (928 kgf-cm, 67 ft. lbs.)
65. CONNECT TIE ROD END SUB-ASSEMBLY RH
HINT: Install the RH side by the same procedures with the LH side.
66. INSTALL ENGINE UNDER COVER SUB-ASSEMBLY NO.1
a. Install the engine under cover sub-assembly No.1 with the 4 bolts.
67. INSTALL ENGINE UNDER COVER ASSEMBLY REAR
a. Install the engine under cover assembly rear with the 6 bolts.
68. INSTALL FRONT WHEEL
Torque: 110 Nm (1,122 kgf-cm, 81 ft. lbs.)
69. PLACE FRONT WHEELS FACING STRAIGHT AHEAD
70. INSTALL TURN SIGNAL SWITCH ASSEMBLY
71. INSTALL SPIRAL CABLE SUB-ASSEMBLY
72. INSTALL STEERING COLUMN COVER LWR
73. CENTER SPIRAL CABLE
74. INSTALL STEERING WHEEL ASSEMBLY
75. INSPECT STEERING WHEEL CENTER POINT
76. INSTALL HORN BUTTON ASSEMBLY
77. INSPECT HORN BUTTON ASSEMBLY
78. INSPECT SRS WARNING LIGHT
79. ADD POWER STEERING FLUID
80. BLEED POWER STEERING FLUID
81. CHECK POWER STEERING FLUID LEAKAGE
82. INSPECT AND ADJUST FRONT WHEEL ALIGNMENT