4 Runner 2WD V8-4.7L (2UZ-FE) (2003)
Torque: 18 N.m (185 kgf.cm, 13 ft.lbf)
e. Install the wire clamp to the bracket of the water by-pass pipe.
19. INSTALL INTAKE MANIFOLD ASSY
a. Instal the 2 new gaskets to cylinder head.
b. Install the intake manifold assy with the 6 bolts and 2 nuts.
Torque:
Bolt 18 N.m (185 kgf.cm, 13 ft.lbf)
Nut 18 N.m (185 kgf.cm, 13 ft.lbf)
20. CONNECT WATER BY-PASS HOSE
21. CONNECT WATER BY-PASS HOSE NO.7
22. INSTALL ENGINE WIRE
Torque: 8.2 N.m (83 kgf.cm, 72 in.lbf)
23. CONNECT FUEL VAPOR FEED HOSE ASSY
24. CONNECT FUEL HOSE NO.2
25. CONNECT FUEL HOSE
26. INSTALL AIR CLEANER HOSE ASSY
27. INSTALL THROTTLE BODY COVER SUB-ASSY
28. REFILL ENGINE COOLANT
29. CHECK FOR ENGINE COOLANT LEAKS
30. INSPECT FUEL LEAK