4 Runner 4WD V8-4.7L (2UZ-FE) (2003)
34. INSTALL BRAKE ACTUATOR BRACKET NO.3
a. Install the brake actuator bracket No.3 with the bolt.
Torque: 7.8 Nm (80 kgf-cm, 69 inch lbs.)
35. INSTALL BRAKE BOOSTER PUMP BRACKET NO.2
a. Using a hexagon wrench (5 mm), install the brake booster pump bracket No.2 with the 2 bolts.
Torque: 7.8 Nm (80 kgf-cm, 69 inch lbs.)
36. INSTALL BRAKE BOOSTER PUMP BRACKET NO.1
a. Install the shaft, 2 collars, 3 bushes and 2 washers.
b. Install the brake booster pump bracket with the bolt.
Torque: 7.8 Nm (80 kgf-cm, 69 inch lbs.)
37. INSTALL BRAKE BOOSTER W/ACCUMULATOR PUMP ASSY
a. Install the brake booster w/accumulator pump assy to the brake master cylinder.
38. INSTALL BRAKE BOOSTER PUMP BRACKET NO.2
a. Using a hexagon wrench (5 mm), install the brake booster pump bracket No.2 on the brake booster pump bracket No.1 and brake master
cylinder with the bolt.
Torque: 11.8 Nm (120 kgf-cm, 9 ft. lbs.)