4 Runner 4WD V8-4.7L (2UZ-FE) (2003)
39. CONNECT FUEL HOSE No.2
40. CONNECT FUEL HOSE
41. INSTALL OIL LEVEL GAGE GUIDE
a. Install the new O-ring to the oil level gage guide.
b. Install the oil level gage guide with the bolt.
Torque: 15 Nm (155 kgf-cm, 11 ft. lbs.)
42. INSTALL TRANSMISSION OIL FILLER TUBE SUB-ASSY
a. Install the transmission oil filler tube sub-assy with the bolt.
43. INSTALL CAMSHAFT (RH BANK)
44. INSTALL TIMING BELT