4 Runner 4WD V8-4.7L (2UZ-FE) (2003)
42. INSTALL STEERING COLUMN ASSY
a. Install the steering column assy with the 4 nuts.
Torque: 26 N.m (265 kgf.cm, 19 in.lbf)
b. Install the 3 clamps and connect the connectors.
43. INSTALL INSTRUMENT PANEL SAFETY PAD SUB-ASSY
44. INSTALL COOLER REFRIGERANT LIQUID PIPE C
a. Lubricate new O-ring with compressor oil and install them on the hose.
Compressor oil: ND-OIL 8 or equivalent
b. Install the cooler refrigerant liquid pipe C and piping clamp.
HINT: After connection, check the fitting for claw of the piping clamp.
45. INSTALL COOLER REFRIGERANT SUCTION PIPE C
a. Lubricate a new O-ring with compressor oil and install them to the pipe.
Compressor oil: ND-OIL 8 or equivalent
b. Install the cooler refrigerant suction pipe C and piping clamp.
HINT: Atter connection, check the fitting for claw of the piping clamp.
46. CHARGE REFRIGERANT