4 Runner 4WD V8-4.7L (2UZ-FE) (2003)
Power Distribution Relay: Testing and Inspection
ACC RELAY
a. Continuity inspection.
1. Using an ohmmeter, check that there is continuity between each terminal.
Specified condition:
2. Using an ohmmeter, check that there is continuity between terminals 3 and 5 when the between voltage is applied across terminals 1 and 2.
Specified condition: Continuity