toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Valve Clearance|Specifications|Page 2065 > < Valve Clearance|Specifications
Page 1
background image

Valve Clearance: Adjustments

ADJUSTMENT 

1. DRAIN ENGINE COOLANT
2. SEPARATE BATTERY NEGATIVE TERMINAL
3. REMOVE THROTTLE BODY COVER SUB-ASSY
4. REMOVE AIR CLEANER HOSE ASSY
5. REMOVE RADIATOR SUPPORT SEAL UPPER
6. REMOVE FAN AND GENERATOR V BELT
7. REMOVE OIL COOLER PIPE
8. REMOVE TIMING BELT COVER SUB-ASSY No.3 LH
9. REMOVE TIMING CHAIN OR BELT COVER No.2

10. REMOVE CYLINDER HEAD COVER SUB-ASSY

a. Remove the 9 bolts, 9 seal washers and cylinder head cover.

11. REMOVE CYLINDER HEAD COVER SUB-ASSY LH

a. Disconnect the PCV hose.
b. Remove the 9 bolts, 9 seal washers and cylinder head cover.

12. SET No.1 CYLINDER TO TDC/COMPRESSION 

a. Turn the crankshaft pulley, and align its groove with timing mark "0" of the No.1 timing belt cover.

b. Check that the timing marks of the camshaft timing pulleys and timing belt rear plates are aligned. If not, turn the crankshaft 1 revolution (360

°) and align the mark as above.

13. INSPECT VALVE CLEARANCE 

Valve Clearance|Specifications|Page 2065 > < Valve Clearance|Specifications