4 Runner 4WD V8-4.7L (2UZ-FE) (2003)
b. Apply MP grease in the illustrated portion.
c. Install the dust cover.
55. INSTALL STEERING TURN PRESSURE TUBE
a. Using SST, install the 2 turn pressure tubes.
SST 09023-38200
Torque: 23 Nm (230 kgf-cm, 17 ft. lbs.) for use with SST
HINT:
-
Use a torque wrench with a fulcrum length of 345 mm (13.58 inch).
-
This torque value is effective in case that SST is parallel to a torque wrench.
56. INSTALL TIE ROD END SUB-ASSY LH
a. Screw the lock nut and tie rod end onto the rack end until the matchmarks are aligned.
b. After adjusting toe-in, torque the nut.
Torque: 88 Nm (897 kgf-cm, 65 ft. lbs.)
57. INSTALL TIE ROD END SUB-ASSY RH
HINT: Install the RH side by the same procedures with the LH side.
58. INSTALL POWER STEERING LINK ASSY
a. Install the power steering link assy with the 2 bolts and 2 nuts.
Torque: 100 Nm (1,020 kgf-cm, 74 ft. lbs.)
NOTICE: The nut has a detent, so never turn the nut, be sure to turn the bolt.
HINT: Insert the bolt and slide it with the gear assy as a unit and then install the bolt on the frame.
59. INSTALL STABILIZER BAR FRONT
60. STABILIZE SUSPENSION
61. CONNECT STEERING GEAR OUTLET RETURN TUBE