4 Runner 4WD V8-4.7L (2UZ-FE) (2003)
After loosening the 2 bolts, raise the bolt from the frame. Slide the power steering gear assembly and the bolt as a unit to the position where the
bolt can be pulled out.
21.
Carefully secure the power steering gear assembly in a vise (if available, use SST P/N: 09612-00012-01).
22.
Remove the rack guide.
A.
Using the SST, remove the lock nut as shown in the illustration.
SST P/N: 09922-10010-01
B.
Using a hexagon wrench (24 mm), remove the rack guide spring cap.
C.
Remove the spring and rack guide.
23.
Install the rack guide spring.
A.
Install the rack guide and new spring (P/N: 44215-35010).
B.
Apply sealant to 2 or 3 threads of the rack guide spring cap.
Sealant: Three Bond 1344, Loctite 242, or equivalent.