toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Power Main Relay|Page 9222 > < Power Main Relay|Page 9220
Page 2
background image

Integration Relay / Key-Off Power Window Signal

1. Connect the positive (+) lead from the voltmeter to terminal 13 and the negative (-) lead to body ground.
2. Close the door with ignition switch turned to LOCK or ACC, and check that the meter needle indicates battery positive voltage.

Integration Relay / Integration Relay / Key-On Power Window Signal

3. Open the door and check that the meter needle indicates 0 V.
4. Turn the ignition switch ON and check that the meter needle indicates battery positive voltage again.

If operation is not as specified, replace the relay.

INSPECT INTEGRATION RELAY CIRCUIT
See: Instrument Panel, Gauges and Warning Indicators/Key Reminder Switch/Testing and Inspection

Power Main Relay|Page 9222 > < Power Main Relay|Page 9220