Avalon V6-3.0L (1MZ-FE) (1996)
(c) Install 2 new gaskets and No.2 EGR pipe with the 4 nuts.
Torque: 12 N.m (120 kgf.cm, 9 ft.lbf)
(d) Install the No.1 engine hanger with the 2 bolts
Torque: 39 N.m (400 kgf.cm, 19 ft.lbf)
(e) Install the air intake chamber stay with the 2 bolts.
Torque: 19.5 N.m (200 kgf.cm, 14 ft.lbf)
(f) Connect the hoses, cables, strap and clamp:
^
Brake booster vacuum hose to intake air control valve for ACIS
^ PCV hose to PCV valve on RH cylinder head
^ Ground strap and cable to intake air control valve for ACIS
Connect the ground cable and strap with the nut.
Torque: 14.5 N.m (145 kgf.cm, 10 ft.lbf)
^
Ground cable to air intake chamber
^
Vacuum hose clamp to fuel pipe
^
2 water bypass hoses to throttle body
^
Air assist hose to throttle body
^
2 PS air hoses to air intake chamber
^
California: EVAP hose to pipe on emission control valve set
^
2 vacuum hoses to pipes on cylinder head plate
^
Vacuum sensing hose to fuel pressure regulator
^
Engine wire clamp to emission control valve set
^
Except California: 2 EVAP hoses (from TVV) to pipe on throttle body
^
Except California: EVAP hose to hose clamp
^
Except California: EVAP hose (from charcoal canister) to pipe on throttle body
(g) Install the PS pressure tube with the 2 nuts.
(h) Connect these connectors and cables:
^
Throttle position sensor connector
^
IAC valve connector
^
EGR gas temperature sensor connector
^
A/C idle-up valve connector
^
VSV connector for ACIS
^
VSV connector for fuel pressure control
^
California: VSV connector for EVAP
^
VSV connector for EGR
^
DLC1 to bracket on intake air control valve
^
Accelerator cable
^
A/T throttle cable
2. INSTALL V-BANK COVER
3. INSTALL RH ENGINE MOUNTING STAY