Avalon V6-3.5L (2GR-FE) (2006)
Canister Purge Control Valve: Testing and Inspection
INSPECTION
1. INSPECT VACUUM SWITCHING VALVE NO.1
a. Check the VSV for open circuit.
1. Measure the resistance.
If the resistance is not as specified, replace the VSV assembly.
b. Check VSV operation.
1. Check that air does not flow from the port as shown in the illustration.
2. Apply battery positive voltage across the terminals.
3. Check that air flows from the ports.
If the result is not as specified, replace the VSV assembly.