Avalon V6-3.5L (2GR-FE) (2006)
d. Connect the ventilation hose No.1.
e. Connect the 3 vacuum hoses.
f.
Connect the fuel vapor feed hose No.1.
18. INSTALL COWL TOP PANEL OUTER
19. INSTALL WINDSHIELD WIPER MOTOR & LINK ASSEMBLY
20. INSTALL COWL TOP VENTILATOR LOUVER RH
21. INSTALL FR WIPER ARM & BLADE ASSEMBLY RH
22. INSTALL FR WIPER ARM & BLADE ASSEMBLY LH
23. ADD ENGINE COOLANT
24. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
25. CHECK FOR ENGINE COOLANT LEAKS
26. CHECK FOR FUEL LEAKS
27. INSTALL V-BANK COVER SUB-ASSEMBLY
a. Engage the 3 clips and install the v-bank cover.
NOTE: Be sure to engage the clips in the order from A to B.
28. PERFORM INITIALIZATION
Some systems need initialization when disconnecting the battery terminal.