toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Variable Valve Timing Actuator Position Sensor > < Transmission Position Switch/Sensor, A/T|Adjustments|Page 984
Page 3
background image

i.

Using a screwdriver, stake the nut with the lock plate.

j.

Install the control shaft lever, washer and nut.
Torque: 13 Nm (130 kgf-cm, 9 ft. lbs.)

k. Connect the park/neutral position switch connector.

8. INSTALL ENGINE UNDER COVER LH
9. INSTALL INTAKE AIR RESONATOR SUB-ASSEMBLY

10. INSTALL AIR CLEANER HOSE NO.1
11. INSTALL AIR CLEANER ASSEMBLY
12. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
13. ADJUST SHIFT LEVER POSITION
14. INSPECT SHIFT LEVER POSITION
15. INSPECT PARK/NEUTRAL POSITION SWITCH ASSEMBLY
16. ADJUST PARK/NEUTRAL POSITION SWITCH ASSEMBLY
17. PERFORM INITIALIZATION

Some systems need initialization when disconnecting the cable from the negative battery terminal.

Variable Valve Timing Actuator Position Sensor > < Transmission Position Switch/Sensor, A/T|Adjustments|Page 984