toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

A/T - Oil Cooler Installation Increases Towing Capacity|Page 7117 > < A/T - Oil Cooler Installation Increases Towing Capacity|Page 7115
Page 4
background image

b. Remove the radiator left hand side deflector as indicated in the illustration.

c. Install the tube bracket with the bolt (P/N 90119-06518) on the side member.

Torque: 62 in.lbf (71 kgf.cm, 7 Nm)

d. Reinstall the radiator left hand side deflector.

6.

Connect Oil Cooler Hose

a. Connect the hoses from the oil cooler tube No. 2 to the oil cooler outlet tube No. 2 as shown.

NOTE:

Install the hose clamp, positioned as indicated in illustrations, and use pliers to remove the clips.

A/T - Oil Cooler Installation Increases Towing Capacity|Page 7117 > < A/T - Oil Cooler Installation Increases Towing Capacity|Page 7115