Avalon XL V6-3.0L (1MZ-FE) (1997)
Canister Purge Solenoid: Testing and Inspection
VSV INSPECTION
1. REMOVE V-BANK COVER AND EMISSION CONTROL VALVE SET AND HIGH-TENSION CORD COVER
2. REMOVE VSV
(a) Disconnect the 2 EVAP hoses from the VSV.
(b) Remove the screw and VSV.
3. INSPECT VSV
A. Inspect VSV for open circuit
Using an ohmmeter, check that there is continuity between the terminals.
Resistance: 27 - 33 ohms at 20°C (68°F)
If there is no continuity, replace the VSV.
B. Inspect VSV for ground
Using an ohmmeter, check that there is no continuity between each terminal and the body.
If there is continuity, replace the VSV.
C. Inspect VSV operation
(a) Check that air flows with difficulty from port E to port F.