toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

A/T - Oil Cooler Installation Increases Towing Capacity|Page 7914 > < A/T - Oil Cooler Installation Increases Towing Capacity|Page 7912
Page 7
background image

Torque: 9 ft.lbf (130 kgf.cm, 13 Nm)

b. Reconnect harness.

c. Install the cruise control actuator cover, clip and bolt.

d. Reinstall and connect battery.

11.

Check for Fluid Leaks

a. Start the engine.

b. With the engine idling and parking brake engaged, shift transmission into all positions from P to L and back to P, stopping momentarily in

each gear position.

c. Check fluid level at idle when temperature reaches 158 to 175°F (70-80°C).

d. Check for leaks from hose and tube connections.

e. Stop engine.

f.

Add new ATF type T-IV fluid (replaces DEXRON II and III).

g. Repeat steps a through f.

NOTE:

Additional Capacity with cooler will be 7 U.S. quarts (5 liters).

12.

Install Front Bumper

A/T - Oil Cooler Installation Increases Towing Capacity|Page 7914 > < A/T - Oil Cooler Installation Increases Towing Capacity|Page 7912