Avalon XLS V6-3.0L (1MZ-FE) (1998)
Repeat b) until the disc has been installed on the 3 remaining hub positions.
d. If the minimum runout recorded in b) and c) is less than 0.05 mm (0.0020 inch), install the disc in that position.
e. If the minimum runout recorded in b) and c) is greater than 0.05 mm (0.0020 inch), replace the disc and repeat step 3.
f.
Install the torque plate and torque the mounting bolts.
Torque: 107 Nm (79 ft. lbs.)
REASSEMBLY
Reassembly is in the reverse order of disassembly.
NOTICE: Apply lithium soap base glycol grease to the parts indicated by arrows.