Avalon XLS V6-3.0L (1MZ-FE) (1998)
10. Remove No.1 timing belt cover.
Remove the 4 bolts and timing belt cover.
11. Remove timing belt guide.
12. Remove No.2 timing belt cover.
a. Remove the bolt, and disconnect the engine wire protector from the No.3 timing belt cover.
b. Disconnect the engine wire protector clamp from the No.3 timing belt cover.
c. Remove the 5 bolts and timing belt cover.
13. Remove RH engine mounting bracket.
Remove the 2 bolts, nut and mounting bracket.
14. Set No.1 cylinder to Top Dead Center (TDC)/Compression.
a. Temporarily install the crankshaft pulley bolt to the crankshaft.
b. Turn the crankshaft, and align the timing marks of the crankshaft timing pulley and oil pump body.
NOTICE: Always turn the crankshaft clockwise.