toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Variable Induction Control Valve|Diagrams|Page 3027 > < Variable Induction Control Valve|Diagrams|Page 3025
Page 1
background image

Variable Induction Control Valve: Service and Repair

REPLACEMENT (PZEV From July 2003) 

1. DRAIN ENGINE COOLANT
2. REMOVE FRONT SUSPENSION UPPER BRACE CENTER (W/ PERFORMANCE ROD)

3. REMOVE ENGINE COVER SUB-ASSEMBLY NO.1

a. Remove the 2 nuts and engine cover.

4. REMOVE AIR CLEANER CAP SUB-ASSEMBLY

a. Disconnect the MAF meter connector.
b. Disconnect the VSV connector.
c. Disconnect the fuel vapor feed hose No. 2.
d. Disconnect the ventilation hose.
e. Disconnect the fuel vapor feed hose No. 1.
f.

Loosen the 2 air cleaner cap bolts.

g. Lock the air cleaner hose clamp and remove the air cleaner cap together with the air cleaner hose.

5. REMOVE INTAKE MANIFOLD

a. Disconnect the ventilation hose No. 2.
b. Disconnect the union to connector tube hose.

Variable Induction Control Valve|Diagrams|Page 3027 > < Variable Induction Control Valve|Diagrams|Page 3025