toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Components|Page 2880 > < Components|Page 2878
Page 1
background image

Timing Chain: Service and Repair
Installation

From 03-2006 to 10-2006

2AZ-FXE ENGINE MECHANICAL: TIMING CHAIN: INSTALLATION

INSTALLATION

1. INSTALL NO. 2 CHAIN SUB-ASSEMBLY

(a) Set the crankshaft key into the left horizontal position.
(b) Turn the drive shaft so that the cutout faces upward.

(c) Align the yellow mark links with the timing marks of each gear as shown in the illustration.
(d) Install the sprockets onto the crankshaft and oil pump shaft with the chain on the gears.
(e) Temporarily tighten the oil pump drive shaft gear with the nut.

(f) Insert the damper spring into the adjusting hole, and then install the chain tensioner plate with the bolt.

Torque: 12 Nm (122 kgf-cm, 9ft-lbf)

Components|Page 2880 > < Components|Page 2878