Camry L4-2.4L (2AZ-FXE) Hybrid (2007)
(a) Temporarily install the electric inverter compressor with the bolt.
(b) Install the electric inverter compressor with the 3 bolts.
CAUTION: Tighten the bolts in the order indicated in the illustration.
Torque: 25 Nm (255 kgf-cm, 18ft-lbf)
(c) Connect the connector (A).
NOTICE: Wear insulated gloves when performing this procedure.
(d) Lock the green-colored lock (B).
NOTICE: Wear insulated gloves when performing this procedure.
(e) Connect the connector (C).
3. INSTALL NO. 1 COOLER REFRIGERANT DISCHARGE HOSE
(a) Remove the attached vinyl tape from the hose.
(b) Apply sufficient compressor oil to a new O-ring and the fitting surface of the electric inverter compressor.
Compressor oil:
ND-OIL 11 or equivalent
(c) Install the O-ring onto the No. 1 cooler refrigerant discharge hose.
(d) Install the No. 1 cooler refrigerant discharge hose onto the electric inverter compressor with the bolt.
Torque: 9.8 Nm (100 kgf-cm, 87in-lbf)
4. INSTALL NO. 1 COOLER REFRIGERANT SUCTION HOSE