Camry L4-2.4L (2AZ-FXE) Hybrid (2007)
1. Connect the 2 connectors and lower the 2 levers.
NOTE: Make sure that the 2 levers are securely lowered.
d. Install the hybrid vehicle control ECU with the 3 nuts.
Torque: 5.5 N.m (56 kgf.cm, 49 in.lbf)
2. INSTALL COWL TOP PANEL OUTER SUB-ASSEMBLY
3. INSTALL BRAKE MASTER CYLINDER RESERVOIR SUB-ASSY
4. INSTALL WINDSHIELD WIPER MOTOR AND LINK
5. INSTALL COWL TOP VENTILATOR LOUVER SUB-ASSEMBLY
6. INSTALL FRONT FENDER TO COWL SIDE SEAL LH
7. INSTALL FRONT FENDER TO COWL SIDE SEAL RH
8. INSTALL WINDSHIELD WIPER ARM AND BLADE ASSEMBLY LH
9. INSTALL WINDSHIELD WIPER ARM AND BLADE ASSEMBLY RH
10. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
11. PERFORM INITIALIZATION
a. Perform initialization procedure.
HINT: Some vehicle systems require initialization after reconnecting the cable to the negative battery terminal.