toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Components|Page 6415 > < Components|Page 6413
Page 1
background image

Shift Cable: Service and Repair
Installation

From 03-2006 to 10-2006

P311 HYBRID TRANSMISSION / TRANSAXLE: TRANSAXLE CONTROL CABLE ASSEMBLY: INSTALLATION

INSTALLATION

1. INSTALL NO. 2 SHIFT CABLE GROMMET RETAINER

(a) Pass the transmission control cable assembly from the cabin to the engine compartment.
(b) Install the shift cable grommet retainer to the transmission control cable assembly.

(c) Install the shift cable grommet retainer with the 2 bolts.

Torque: 5.0 Nm (51 kgf-cm, 44in-lbf)

2. INSTALL TRANSMISSION CONTROL CABLE ASSEMBLY

(a) Install the transmission control cable assembly as shown in the illustration.

HINT:
-

Install the floor shift cable with the uneven surface facing up.

-

Securely engage the claws of the floor shift cable.

Components|Page 6415 > < Components|Page 6413