toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3739 > < Initial Inspection and Diagnostic Overview|Page 3737
Page 29
background image

INSPECTION PROCEDURE

NOTICE:
-

Turn the ignition switch off before measuring the resistance of the CAN main wire and CAN branch wires.

-

After the ignition switch is turned off, check that the key reminder warning system and light reminder warning system are not operating.

-

Before measuring the resistance, leave the vehicle as is for at least 1 minute and do not operate the ignition switch, any other switches or
the doors. If doors need to be opened in order to check connectors, open the doors and leave them open.

HINT: Operating the ignition switch, any other switches or any triggers related ECU and sensor communication on the CAN, which would
cause resistance reading variations.

PROCEDURE

1. CHECK FOR SHORT TO GND IN CAN BUS WIRE (DLC3 BRANCH WIRE)

(a) Turn the ignition switch off.
(b) Disconnect the DLC3 branch wire gray connector (E62) from the No. 1 CAN J/C "B" side (without earth terminal).

NOTICE:
-

Before disconnecting the connector, make a note of where it is connected.

-

Reconnect the connector to its original position.

Initial Inspection and Diagnostic Overview|Page 3739 > < Initial Inspection and Diagnostic Overview|Page 3737