Camry V6-3.5L (2GR-FE) (2008)
Main Relay (Computer/Fuel System): Testing and Inspection
2GR-FE ENGINE CONTROL SYSTEM: CIRCUIT OPENING RELAY:
INSPECTION
1. INSPECT CIRCUIT OPENING RELAY
(a) Using an ohmmeter, measure the resistance according to the value(s) in the table below.
Standard resistance: