Camry V6-3.5L (2GR-FE) (2008)
(a) Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
(b) Install the camshaft timing oil control valve with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
NOTE: Make sure that the O-ring is not cracked or jammed when installing the oil control valve.
(c) Connect the camshaft timing oil control valve connector.
4. INSTALL CAMSHAFT TIMING OIL CONTROL VALVE (for Bank 1 Exhaust Side)
(a) Apply a light coat of engine oil to a new O-ring and install it to the camshaft timing oil control valve.
(b) Install the camshaft timing oil control valve with the bolt.
Torque: 10 Nm (102 kgf-cm, 7 ft-lbf)
NOTE: Make sure that the O-ring is not cracked or jammed when installing the oil control valve.
(c) Connect the camshaft timing oil control valve connector.
5. INSTALL INTAKE AIR SURGE TANK (See: Fuel Delivery and Air Induction/Fuel Injector/Service and Repair/Installation)
6. INSTALL NO. 1 AIR CLEANER INLET (See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Installation)
7. INSTALL AIR CLEANER CASE SUB-ASSEMBLY (See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Installation)
8. INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See: Fuel Delivery and Air Induction/Throttle Body/Service and Repair/Installation)
9. INSTALL AIR CLEANER INLET ASSEMBLY (See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Installation)
10. INSTALL V-BANK COVER SUB-ASSEMBLY (See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Installation)
11. INSTALL COOL AIR INTAKE DUCT SEAL (See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Installation)