Camry V6-3.5L (2GR-FE) (2008)
Throttle Body: Service and Repair
Removal
2GR-FE ENGINE CONTROL SYSTEM: THROTTLE BODY:
REMOVAL
1. REMOVE ENGINE UNDER COVER LH
2. REMOVE ENGINE UNDER COVER RH
3. DRAIN ENGINE COOLANT (See: Engine, Cooling and Exhaust/Cooling System/Coolant/Testing and Inspection)
4. REMOVE COOL AIR INTAKE DUCT SEAL (See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Removal)
5. REMOVE V-BANK COVER SUB-ASSEMBLY (See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Removal)
6. REMOVE AIR CLEANER INLET ASSEMBLY (See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Removal)
7. REMOVE AIR CLEANER CAP SUB-ASSEMBLY
(a) Disconnect the 3 vacuum hoses.
(b) Disconnect the mass air flow meter connector (*1).
(c) Disconnect the No. 2 ventilation hose (*2).
(d) Disconnect the hose band (*3).
(e) Disconnect the 3 bands, and remove the air cleaner cap sub-assembly.
8. REMOVE AIR CLEANER CASE SUB-ASSEMBLY (See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and
Replacement/Removal)
9. REMOVE NO. 1 AIR CLEANER INLET (See: Engine, Cooling and Exhaust/Engine/Service and Repair/Removal and Replacement/Removal)
10. REMOVE THROTTLE BODY