toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

A/T - Oil Cooler Increases Towing Capacity|Page 5254 > < A/T - Oil Cooler Increases Towing Capacity
Page 2
background image

Warranty Information

Procedure

1.

Parts removal in preparation for cooler installation:

A.

Remove the 9 bolts, 2 screws and the center engine under cover.

B.

Remove the engine coolant temperature switch connector and the wire clamp.

C.

Remove battery and tray.

D.

Disconnect the cooling fan connector.

E.

Disconnect the No. 1 engine coolant temperature switch wire connector.

F.

Remove the 2 bolts and then the cooling fan.

2.

Cooler Installation:

A/T - Oil Cooler Increases Towing Capacity|Page 5254 > < A/T - Oil Cooler Increases Towing Capacity