toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Power Window Relay|Testing and Inspection|Page 435 > < Rear Defogger Relay|Locations|Page 431
Page 1
background image

Power Window Relay: Testing and Inspection

INSPECT POWER MAIN RELAY CONTINUITY

If continuity is not as specified, replace the relay.

Key-Off Power Window Signal:
INSPECT INTEGRATION RELAY (TYPE B) OPERATION

HINT:  When the relay circuit is as specified, inspect the key-Off power window signal.

a. Connect the positive (+) lead from the voltmeter to terminal A 3 and the negative (-) lead to body ground.
b. Close the door with ignition switch turned to LOCK or ACC, and check that the meter needle indicates battery positive voltage.
c. Open the door and check that the meter needle indicates 0 V.

d. Turn the ignition switch ON and check that the meter needle indicates battery positive voltage again.

If operation is not as specified, replace the relay.

Key-off Power Window Signal:
INSPECT INTEGRATION RELAY (TYPE C) OPERATION

HINT:  When the relay circuit is as specified, inspect the key-Off power window signal.

Power Window Relay|Testing and Inspection|Page 435 > < Rear Defogger Relay|Locations|Page 431