toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Valve Body|Page 4968 > < Valve Body|Page 4966
Page 3
background image

10. REMOVE B3 APPLY PIPE 

Pry up the pipe with a screwdriver and remove the pipe.

11. REMOVE VALVE BODY 

a. Remove the 9 bolts.

b. Disconnect the throttle cable from the cam and remove the valve body.

12. REMOVE 2ND BRAKE APPLY GASKET
13. REMOVE SOLENOID VALVES

a. Remove the 3 bolts, shift solenoid valve No.1 and No.2 with the retainer.

NOTICE:  When removing solenoid, do not use a screwdriver, etc. to pry up the solenoid.

b. Remove the O-rings from the shift solenoid valve No.1 and No.2.

c. Remove the bolt and shift solenoid valve SL.
d. Remove the O-ring from the shift solenoid valve SL.

Valve Body|Page 4968 > < Valve Body|Page 4966