toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Circuit Opening Relay <--> [Fuel Pump Relay]|Locations|Page 161 > < Circuit Opening Relay <--> [Fuel Pump Relay]|Locations|Page 159
Page 1
background image

Circuit Opening Relay: Testing and Inspection

Circuit Opening Relay Inspection - Checking Continuity

Inspect Relay Continuity

- Using an ohmmeter, check that there is continuity between terminals ST and E1.
- Check that there is continuity between terminals IG and FC.
- Check that there is no continuity between terminals B and FP.
- If continuity is not as specified, replace the relay. 

Circuit Opening Relay Inspection - Checking Operation

Inspect Relay Operation

- Apply battery voltage across terminals ST and E1. 
- Using an ohmmeter, check that there is continuity between terminals B and FP.
- If operation is not as specified, replace the relay.

Circuit Opening Relay <--> [Fuel Pump Relay]|Locations|Page 161 > < Circuit Opening Relay <--> [Fuel Pump Relay]|Locations|Page 159