toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

EGR Control Solenoid|Specifications|Page 2656 > < EGR Control Solenoid|Specifications|Page 2654
Page 1
background image

EGR Control Solenoid: Service and Repair

PROCEDURE

Removal

1. Disconnect negative (-) terminal cable from battery.

CAUTION: Work must be started after 90 seconds from the time the ignition switch is turned to the LOCK position and the negative (-) terminal
cable is disconnected from the battery.

2. Remove V-bank cover; using a 5 mm hexagon wrench, remove the 2 cap nuts and V-bank cover.

3. Remove emission control valve set.

EGR Control Solenoid|Specifications|Page 2656 > < EGR Control Solenoid|Specifications|Page 2654