toyota Workshop Repair Guides

Toyota Workshop Service and Repair Manuals

Fuel Injector|Removal|Page 3575 > < Fuel Injector|Removal|Page 3573
Page 6
background image

-

Type A 
-

Install the throttle body with the 4 bolts.

Torque:  19 Nm (14 ft.lb) 

Bolt Length:

A - 45 mm (1.77 in)
B - 55 mm (2.17 in)
 

-

Type B
-

Install the throttle body with the 2 bolts and 2 nuts.

Torque:  19 Nm (14 ft.lb) 

-

Connect the following hoses to the throttle body:

1. PCV hose
2. 2 vacuum hoses from EGR vacuum modulator
3. Vacuum hose from the TVV for EVAP

-

Connect the IAC valve connector.

-

Connect the throttle position sensor connector.

14. INSTALL AIR CLEANER CAP, RESONATOR AND AIR CLEANER HOSE.

-

Connect the air cleaner hose to the throttle body.

-

Install the air cleaner cap together with the resonator and the air cleaner hose.

-

California vehicles only: 

Fuel Injector|Removal|Page 3575 > < Fuel Injector|Removal|Page 3573